ge_title -->

What are the various steps involved in making a bed with 3 bed shuts of a 5 star hotel?

Long Answer Questions

  1. What are the various steps involved in making a bed with 3 bed shuts of a 5 star hotel? Explain the shape in sequence.

Ans: Bed making involves two objectives, one is to cleaning that is to keep it dust, dirt and germ free and other objective is to prepare it for re-use. A bed contains different materials. The Bed materials can be divided into two parts:

  1. Bedding consists of mattress, Blanket/ quilt and Pillow
  2. Bed linen consists of Bed sheets, Pillowcases and Mattress protector

Bed Making Procedures

Step 1:  Strip the soiled sheets from bed and pillow cases

  • Go in a circle
  • Shake the sheet on the bed

Step 2:  Check the mattress pad

Step 3:  Change the mattress pad if necessary

Step 4: Place the bottom sheet

  • 1st sheet on the mattress with equal amount on all sides and tuck in head board and foot board side

Step 5: Miter the bottom sheet at the upper left corner of the bed

Step 6: Miter the bottom sheet at the upper left corner of the bed

Step 7: Miter the bottom sheet on the next side of the bed

Step 8: Place the second sheet with wrong side up

Step 9: Place blanket on top of 2nd sheet about 6 to 8 inches away from head board

Step 10: Place 3rd sheet over the blanket and turn it under the blanket. This step is necessary if 3 sheets are used. Only 4/5 star hotels use 3 sheets

Step 11: Turn the 2nd sheet over the blanket and tuck in lower part with miter corner

Step 12: Make sure that the blanket and sheet are tucked in neatly along the side of the bed.

Step 13: Place the pillows with the slips making sketch in the center

Step 14: Place the bed cover. Make sure the seams and patterns are staring, neat and smooth.

Step 15: Check the bed for smoothness from a distance.

Read Also:

Important questions answer of Hotel Management | Grade XI | Food and Beverage Service

All Chapters Summary of The Heritage of Words | Grade XII

Leave a Comment